Hogarths which is an ISO 9001:2015 QMS Certified Organisation, a leading engineering and steel fabrication company based in Bulawayo, Zimbabwe recently successfully completed the Mimosa Plant Optimization Project. The project involved the construction of three processing plants, namely the milling area, primary roughers, and cleaners. (Structural steel fabrication & erection).

Mimosa Mine, one of the top three platinum mines in Zimbabwe contracted Hogarths for this project, with DRA Global as the Project Managers. The objective of the project was to optimize the mine’s platinum production by repurposing steelwork from a mine in South Africa. This trend is becoming prevalent because of sustainability, cost-effectiveness and versatility, which is an encouraging move by Mimosa as it aims at sustainability.

The project was completed within the Client’s budget even though there were overruns due to unknown complexities. Hogarths’ team of experienced engineers and steelworkers worked closely with the Mimosa Mine team and DRA team to ensure the smooth and efficient execution of the project. Hogarths achieved over 500 000 LTI free man-hours worked and received an achievement award from DRA. This shows a commitment to SHE by Hogarths.

The project involved a number of challenges, including:

  • The condition of the steelwork from the decommissioned mine. This steel work was painted after installation.
  • The need to modify the steelwork to fit the specific requirements of the Mimosa Mine plant.
  • The transportation of the steelwork to the Mimosa Mine site.
  • The installation of the steelwork, which was a complex and delicate process.

To overcome these challenges, Hogarths used a number of innovative solutions, including:

  • Using computer-aided design software to create the modifications.
  • Using an efficient logistics coordination setup in the pre-clearance and transportation to the installation site inside Mimosa mine premises.
  • Using a team of experienced steel fabrication experts to install the steelwork.

Hogarths has a strategic partnership with VIVA Engineering in South Africa, this partnership aims to benefit the client as both engineering companies pool resources to ensure a short project turnaround time. The successful completion of the Mimosa Plant Optimization Project is a testament to Hogarths’ expertise in engineering and steel fabrication. The company has a long history of delivering high-quality projects on time and within budget. Hogarths is a reliable partner for any mining company looking to optimize its production.